Processing period filter requires to provide full period name

Description

Description:
In Stockouts report the processing period filter require to provide full period name, but it should instead search for records containing the provided string.

Reproduction steps:
1. Go to "Reports" -> "View reports" -> Stockout
2. There should be some data available - if not:

  • Create, Authorize and Approve a requisition with at least one product (if there is no previous requisition data)

  • Run processors groups on the NiFi, so the data will be fetched to reports

3. Type substring of one of the available processing periods in "Processing Periods" filter

Expected result:
The records with processing period containing this string are found.

Environment

Assignee

Unassigned

Reporter

Oskar Hinc

Labels

Epic Link

Components

Priority

Minor
Configure