Comment: Task marked complete

UAT Entry Criteria Checklist

Key:

Status
colourGreen
  Already Done

Status
colourYellow
  Expect to be completed for UAT starting 3/10

Status
colourRed
  Not expected to be completed for UAT starting 3/10

 

  Remove from UAT list?
ItemStatusOwner

Estimated Done Date

(90% Confidence)

Notes
  •  ThoughtWorks Development Complete
  • (2/28 Scope)
Status
colourGreen
titleDone
Ron 2/28 
  •  ThoughtWork Demos Reviewed/Approved
 
Status
colourYellow
Timoteo 3/10

Timoteo at conference. Final showcase hasn't been reviewed.

  •  Tablet Solution Complete
    • procured
    • connectivity solution
      lockdown
Status
ui changes
colour
tested
Green
 
title
Ron
Done
 
Josh 
  •  Data Edit Feature (Access) Complete & Unit Tested
 Ron3/8 

Josh to work on lockdown. Offline access issue is impediment to UAT testing. Could start PC UAT before Tablet UAT.

Lockdown moved to Go Live Entry

  •  VillageReach Analytical Report Workbook Complete & Unit Tested
 Mike 
Status
colourYellow
Vidya & team3/7

Separated Website UAT and Reporting UAT to mitigate the long delay in getting a response from Tableau on data source issue. Reporting UAT will start 3/19

  •  VillageReach Provincial (Portuguese) Workbook Complete & Unit Tested
  • Monthly Summary Report, Map Report, Detail Reports
  • PDF of Monthly Summary Generated (one-off process OK)
  • HSG Feedback Incorporated
  • Calculations Tested
  • In Portuguese
 Mike 

 
Status
colourYellow
Vidya & team3/7

Separated Website UAT and Reporting UAT to mitigate the long delay in getting a response from Tableau on data source issue. Reporting UAT will start 3/19

  •  SELVdata ETL Complete & Unit Tested
 
Status
colourGreen
Josh Dependent on TW Dev Complete (+5 days)3/7

Almost complete. Need to validate no changes need for child coverage reporting.

  •  vrMIS Data Migration Scripts Complete & Unit Tested
 
Status
colourGreen
Josh  Need to migrate refrigerator inventory as well. (Josh & Ron to discuss)
  •  Architecture Document Complete
Status
colourGreen
Josh1/15 
  •  SELV Environment Installed. Procedure Tested & Documented.
 
Status
 Josh
colourGreen
Josh3/7

SSL Cert still outstanding with Vendor - moving to production release. Logging issue resolved.

Josh talked with Mike and now has access to the service issuing the certificate.  Waiting for their verification process to complete.  No time estimate currently.

SSL moved out of scope.

 

  •  SELV Reference Data Files Uploaded & System Configured (in Portuguese)
 
Status
Josh
colour
 
Green
 
Josh
  •  SELV Backup/Restore Process Tested & Documented
2/28
 Josh
  •  
 
  •  UAT Plan Complete
Status
colourYellowGreen
Sarah23/287In progress
  •  Training Materials Complete
. Will distribute to team for feedback (much needed!)
  •  Integration End-to-End Tests (SELV-> SELVData -> Reporting)
Status
colourYellowGreen
Sarah, Vidya, Josh, Timoteo3/7Not started, but confident can be completed before training date
  •  SELV Pre-Release Testing
Scope modified to include vrMIS data migration through Tableau. SELV Data Entry through tableau will be tested during UAT.
  •  Bugs assigned to UAT Release resolved (see below)
Status
colourRedGreen
Sarah New. Activity was not planned for. Need to do significant testing before release?
  •  Reporting Integration Tests
Status
colourRed
? New. With Mike gone, and SELVData ETL delayed by Thoughtworks, unclear on strategy for reporting integration tests
  •  Data Completeness Report
 Josh New
  •  Reporting Documentation
   New  Is this needed? What is required?Ron, Josh3/10On target for delivery by 3/10.

 