Scope
This pages address the tests that will be conduced during the May 2014 technical assessment trip to Mozambique. These tests are not an exhaustive regression test of all SELV and Tableau functions. The focus of these test is on activities that are likely to have problems in-country.
Testing Roles & Responsibilities
Test Activity | Team | Who | Status |
---|---|---|---|
SELV Application Testing (Seattle) | ISG | Sarah | Done |
Tableau Report Testing (Seattle) | HSG | Vidya | Done |
SELV Application Testing (Maputo and provincial offices) | ISG | Josh | Week of 5/5 |
SELV Technical Knowledge Transfer to Tatenda | ISG | Josh | Week of 5/5 and ongoing |
SELV Business Knowledge Transfer to Tatenda | HSG | Vidya | Week of 4/28 and ongoing |
SELV Table Demo/Gather Feedback (Maputo) | ISG | Josh | Week of 5/5 |
Test Checklist
Tests to Conduct at VillageReach Office - Maputo (Josh) | ||
Category | Test | Result |
---|---|---|
Basic System Functioning Over Wifi, Josh's Laptop | Access selv website | |
Access selv training website | ||
Login | ||
Lost password - receive email | ||
Access Initiate Distribution page. Application successfully cached. | ||
Initiate distribution | ||
Enter data in offline mode, and change between online and offline | ||
Sync distribution | ||
Sync distribution including facility already synced by another user | ||
Basic System Functioning Over 3G, Josh's Laptop | Access selv website | |
Access selv-training website | ||
Login | ||
Lost password - receive email | ||
Access Initiate Distribution page. Application successfully cached. | ||
Initiate distribution. Distribution successfully cached. | ||
Enter data in offline mode, and change between online and offline | ||
Sync distribution | ||
Sync distribution including facility already synced by another user | ||
Basic System Functioning Over Wifi, Tatenda's Laptop | Access selv website | |
Access selv-training website | ||
Login | ||
Lost password - receive email | ||
Access initiate distribution page. Application successfully cached. | ||
Initiate distribution. Distribution successfully cached. | ||
Enter data in offline mode, and changebetween online and offline | ||
Sync distribution | ||
Sync distribution including facility already synced by another user | ||
End-to-End | Enter data for paper data collection forms (or vrMIS if none are available). Run reporting process, confirm flow-through to Tableau. | |
Open tableau workbook in tableau reader | ||
Spot check that data entered matches data in Tableau | ||
Admin Functions | Add a field coordinator user, ensure Tatenda receives email | |
Disable user | ||
Add a facility (use new facilities identified during recent field coordinator meeting) | ||
Remove a facility (use facility no longer serving as an immunization post identified during field coordinator meeting) | ||
Override ISA for facility | ||
View data completeness report | ||
Install data edit tool | ||
View synced data in data edit tool | ||
Edit synced data in data edit tool, confirm flow-through to Tableau | ||
Tablet over 3G | Start-up tablet | |
Access SELV, login | ||
Initiate Distribution | ||
Enter Distribution Data | ||
Sync Distribution |
Tests to Conduct at VillageReach Office - Maputo (Tatenda) | ||
Category | Test | Result |
---|---|---|
Translations | Translations on SELV website (all pages) are correct | |
Translations in Tableau workbook (all pages) are correct |
Tests to Conduct for Matola Site Visit | ||
Category | Test | Result |
---|---|---|
Basic System Functioning Over 3G, Field Coordinator PC | Access selv website | |
Access selv training website | ||
Login | ||
Access Initiate Distribution page. Application successfully cached. | ||
Initiate distribution. Distribution successfully cached. | ||
Page download times are acceptable | ||
Field coordinator enters data in offline mode from a paper distribution form (repeat as time allows) | ||
Sync distribution | ||
Clear cache and delete indexdb file at end of visit (note location) | ||
Tablet Demo | Field Coordinator tries tablet at Provincial Office. Feedback gathered. | |
Field Coordinator tries tablet at health center. Feedback gathered. | ||
Tablet works in real-world conditions while in-route to provincial office. | ||
Post Visit Report Testing | View data entered by FieldCoordinator on-site in data edit tool | |
Confirm data flow-through to Tableau. Compare calculated values with vrMIS if applicable | ||
View Data Completeness Report |
Tests to Conduct for Xai Xai Site Visit | ||
Category | Test | Result |
---|---|---|
Basic System Functioning Over 3G, Field Coordinator PC | Access selv website | |
Access selv training website | ||
Login | ||
Access Initiate Distribution page. Application successfully cached. | ||
Initiate distribution. Distribution successfully cached. | ||
Page download times are acceptable | ||
Field coordinator enters data in offline mode from a paper distribution form (repeat as time allows) | ||
Sync distribution | ||
Clear cache and delete indexdb file at end of visit (note location) | ||
Tablet Demo | Field Coordinator tries tablet at Provincial Office. Feedback gathered. | |
Tablet works in real-world conditions while in-route to provincial office. | ||
Post Visit Report Testing | View data entered by FieldCoordinator on-site in data edit tool | |
Confirm data flow-through to Tableau. Compare calculated values with vrMIS if applicable | ||
View Data Completeness Report |