I would like to update/ edit existing supervisory node. Important: when supervisory node is associated with requisition I should not be able to update / edit existing requisition (this negative test case is tested in: OLMIS-1675: Contract test for update supervisory node in existing basic requisition.Done).
Acceptance criteria
as administrator I should be able to update/ edit existing supervisory node,
supervisory node should not be associated with any requisition,
contract test should test: edit/ update existing supervisory node,
contract test is still being triggered automatically by CI/CD process and the tests pass,
after I should log out.
Feature draft
should be added later