Target releaseVaccine Module
Epic


Document status
Status
titleDRAFT
Document owner


Designer


Goals

  • Add on reports needed for vaccines within Stock Management

Background

Vaccines May 2017 Workshop Attendees: Ryan McWhorter (UNICEF), Dorthe Konradsen (UNICEF), Teresa Ha (UNICEF), Brandon Bowersox-Johnson (VillageReach), plus some attendees who joined on day 2 or 3. 

OpenLMIS version 3.1 will deliver the following features within .0 previously delivered an initial beta of stock management.   See Stock Management for the detailed list of features.


Assumptions

  • insertReporting technology (Jasper, Tableau, Pentaho, HTML reports, etc) still needs to be addressed. The reports below could be built in a number of different technologies. But before we start building them, we need to determine if any of these need a new platform.

Reports

For ALL these, we want report drill-ins by:

  • Facilities drill in by geographic level down to a single facility
  • Products drill in by category to a single product
#TitleReport
Label
ImportanceNotes/JIRA Tickets
1Closed vial wastage

KPI3. Closed vial wastage - DISC KPI

with the drill-ins mentioned above, plus a drill-in by wastage reason

MVP
2Full stock availability

KPI2. Full

Stock Availability6Future stock sufficiency reportQuestion: how much is this covered in Forecasting and Estimation?7Product availability report(SM Rep 2)8

stock availability

This is an alternative to Stocked According to Plan (SATP) that is needed for any time we don't have a min and max specified.

MVP
3Stocked according to plan

KPI1. Stocked according to plan - DISC KPI 

Measured by facility and by product (quarterly – intermediate levels; annually – national, global).

MVP
4Stock sufficiency report

Stock sufficiency report

(Connects to Forecasting & Estimation domain)

MVP
5Open Vial Wastage

KPI. Open Vial Wastage

...so that Program Managers can accurately forecast and can address program practices
(see the notes and discussion about this from the Enter Stock Data ticket; also, this is only an issue at Service Delivery Points which may not be facilities using OpenLMIS) 

Next

Brandon Bowersox-Johnson, let's discuss.


Down Votes: 2
At the workshop this was included in the MVP as the very lowest item, but was down-voted.
6Space utilization

Space utilization - a KPI or a report?

space used / total space in CCE (connects to CCE domain)

Next
7Slow-moving items/inventory turns

Slow-moving items/inventory turns

This would be a query that could be helpful for root cause analysis.

Next

Sources:

Diagrams

none

Dependencies

insertDepends on data we get from B. Enter Stock Data and A. Dependencies & Configuration

Open Questions

Below is a list of questions to be addressed as a result of the vaccine workshop:


QuestionOutcome
1Reporting technology (Jasper, Tableau, Pentaho, HTML reports, etc) still needs to be addressed. (see note in Assumptions above)
2

3

Out of Scope

Out of scope for this feature OR potentially saving for future development.(see Next in User Stories above)