1

                                                                                 Open the requisition and check if Total R&R Cost is displayed properly.                                                                                                                                                                                                                                                                  

2

Check if both cost from Full Supply and Non-Full Supply is are summed in Total R&R Cost. 

 

3

 Change the Approved Quantity when requisition is authorized. Verify if the Total Requisition Cost is modified.

 



 

4

 Skip one product.

 The amount of skipped product(s) is omitted from the total cost for R&R.

 

5

 Skip all products.

The amount of skipped product(s) is equals to 0.


 

6

Unskip one/more products

The cost of the unskipped product(s) is included in the total cost.

  • situation when one product is unskipped


 

7

 
 Add one non-full supply products and check if Total Requisition Cost is changed. 

 

8

                                                
                     Change the requested quantity for non-fully supply product and check if Total Requisition Cost is changed.                       

 


 

 

Post – conditions: