Attendees
Discussion
Gap Feature Groupings: Gap Feature Groupings
Roadmap Epics: https://openlmis.atlassian.net/issues/?filter=20570
Potential Goals Gap Teams
Features
- - OLMIS-4842Getting issue details... STATUS (Team Mind the Gap - continuing from work started before 3.6)
-
-
OLMIS-5626Getting issue details...
STATUS
(Team Mind the Gap)
- Scope still needs to be clarified further and determined if we will use our program
- Notifications (JSI) the following pages and epics should be reviewed and the 3.6 scope still needs to be defined.
- Requisition - Customizable notification messages
- Notifications - Push Reminders
- - OLMIS-1094Getting issue details... STATUS
- Interface
- DHIS2 - - OLMIS-5443Getting issue details... STATUS
- Interface - Google Analytics
- Reports
- Reporting - Data pump for R&R and SM - we originally discussed doing this but don't see this on the list of epics
Goals for Team Parrot
- Architecture
- Release faster (this needs scoping)
- Demo data (needs scoping)
- Performance
Goals for external JSI
Considerations with Scheduling
- Ona is the only team which can (currently) build on reporting
- We need to train the other teams soon though
- DHIS2 is going to be handled within the Reporting stack
- OLMIS-5626 scope needs to be further defined and JSI is a key stakeholder
- Data pump work should be done by micro-service/Java teams
Action Items
- Ashraf to schedule meeting (grooming call) with Mary Jo Kochendorfer (Deactivated) and Wesley Brown to discuss work between 3.5 and 3.6
- Wesley Brown to schedule followup meeting once Ona has had their planning meeting
- Include Ona and Parrot
- Need to determine:
- Priority of goals
- Match teams to goals