CCE Domain Parent Page 1
his page summarizes the discussions and requirements gathered thus far for this domain.
TO DO:
- For all stories, under I and II, reconcile user personas listed
- Link up stories with the exact source from archive
- Figure out what the "backside" of the card will be – if you have a screenshot from an existing system to print on the other side of the card, figure out which screen shot and send to Alice for printing.
- The following table will be represented as cards and printed out so folks can move things around.
Important highlights to note:
I - MVP for Domain
CCE Functionality Scope:
Vaccines are completely reliant on a properly functioning CCE in order to remain potent and safe to use.
OpenLMIS should be able to capture the functionality status of CCE – working, working intermittently, not working at all, as well as record information for what could be causing the failure.
This information is then used to: 1) determine which locations can store vaccines and which cannot; 2) plan for which locations need maintenance work; 3) plan for which locations need replacement of equipment; and 4) if the data allows for disaggregation by reason for non-functioning or by equipment type, the indicator and trend can also be used to assess performance of particular types of models of CCE in the field to figure out which ones to purchase in the future.
In settings where possible (RTM, see those reqs here) the system should be able to receive notifications/updates about CCE functionality (via interoperability considerations with RTM platforms)
Finally, based on the data that gets entered into the system, notifications/updates to specific personas (upstream store managers, maintenance technicians and managers, facility staff) should be possible when functionality is affected.
CCE Temperature & Functionality | |
---|---|
Input Temperature and Functionality Status manually As a HW or DIVO/RIVO, I want to input the temperature and corresponding functionality status of a CCE device so that:
Acceptance criteria:
| |
Input reasons for failure or improper function manually As a HW or DIVO/RIVO, I want to input the reason for improper functionality of the facility CCE so that:
Acceptance criteria:
| |
View CCE functionality status per facility As a DIVO/RIVO, I want to see the functional status of the CCE within my facility so that I can be aware of the health of my cold chain, address any issues, and escalate request for maintenance when needed. As a sub-national store manager, I want to see the functional status of a CCE at a specific facility so that I can plan the pick-up or delivery order As a CCE maintenance planner, I want to see the functional status of a CCE at a specific facility so that I can plan the schedule for repair or replacement | |
View CCE functionality summary As an EPI Manager I would like to view my current cold chain inventory so that I can see which refrigerators need repair, and better plan replacements, see breakdowns by type and unit, and estimate additional volume for new vaccine introductions. Acceptance Criteria
| |
View CCE temperature status As a sub-national store manager, I want to see the temperature status of a CCE at a specific facility so that I can plan the pick-up or delivery order As a CCE maintenance planner, I want to see the functional status of a CCE at a specific facility so that I can plan the schedule for repair or replacement | |
View CCE available storage capacity As a RIVO I want to see the storage capacity which is available and the storage capacity required to store Regional routine vaccine so that I can plan appropriately for scheduled deliveries. Acceptance Criteria:
[VIMS/VLMIS] CCE : Monitoring and Supervision Dependencies: Needs to know how much stock is in CCE. This means that we need this info from either: physical stock count OR from resupply w/in distribution workflow. Physical inventory also needs to be linked with specific "shelf"/ CCE location Brandon Bowersox-Johnson |
Configuration & Admin | |
---|---|
Create CCE catalog via CSV As a national EPI program supervisor, I want to create a catalog of all the possible CCE in my system so that each CCE technician can add/register their specific equipment inventory.
CSV could be version of PQS : file:///Users/rachelpowers/Downloads/D_Catalogue_20170410(V0).pdf | |
Add & Delete facility CCE from catalog As a DIVO, I need to select equipment from the existing CCE catalog so that I can create a list of specific CCE at each facility Rachel Powers (Deactivated) | |
Add specific equipment info As a DIVO, I need to add device-specific information for each piece of CCE so that I can have a full record of each CCE at the facility
| |
Reports | |
---|---|
Functional status of CCE - DISC KPI | |
Temperature alarms - DISC KPI | |
Available CCE storage capacity - DISC KPI |
Open Questions:
- To confirm: only one CCE catalog is needed per country. Or do we need to account for multiple catalogs for places that are more strictly province-based? e.g. Pakistan
- Is Nexleaf the only RTM device that we see as relevant to include in our integrations? What is the market share of other options and is it needed to expand this functionality?
Do we need to enable a process for CCE technicians to suggest equipment to be added to the national catalog? e.g. in case of rogue refrigerator donation
What falls under the category of equipment? Refrigerators/passive storage devices such as cold boxes/freezers/walk-in cold rooms?
In places where facility level access to OpenLMIS is possible, is twice a day log needed or once a day sufficient?
What is the current workflow using fridge tags?
Is daily log needed to be captured in instances where there is no facility-based access to OpenLMIS? If so, what is the workflow for that?
II - Nice to Have Features
Alerts & notifications | ||
---|---|---|
Generate notification based on CCE functionality As a storeroom manager, I want to get a notification when my CCE is no longer working properly so that I can move the products stored within it. As a CCE technician, I want to get a notification when my CCE is no longer working properly so that I can address the issue and identify the next steps for issue management/repair/request for parts/replacement. Other potential personas needing this feature: As an upstream store manager, I want to know when a CCE is no longer working properly so that I can plan the upcoming order for that store accordingly As an upstream logistician, I want to know when a CCE is no longer working properly so that I can plan the upcoming distribution schedule for that facility accordingly | ||
Nonfunctional CCE alert As a RIVO I want to receive a text message/System notification when a refrigerator at my District Vaccine Stores (DVS) becomes non-functional So that I can make sure that a repair technician is dispatched
| ||
Generate notifications depending on temperature falling below 2 or above 8 As a HW at a facility, I want to know when a CCE is no longer working so that I can move the products stored within it As an upstream CCE personnel, I want to know when a CCE is no longer working properly so that I can plan a repair or replacement schedule As an upstream store manager, I want to know when a CCE is no longer working properly so that I can plan the upcoming order for that store accordingly As an upstream logistician, I want to know when a CCE is no longer working properly so that I can plan the upcoming distribution schedule for that facility accordingly | ||
Advanced notifications options Escalations. reminders, recurring/silence-able, acknowledge-able notifications for non-functional CCE |
Open Question:
- how important is it to break out each persona's need for the report/alert/notification? If we build the notification piece, isn't it pretty simple to add new permissions & recipients to those alerts? Is understanding the different personas needing it at this stage more about gauging importance of the feature?
Configuration & Admin | |
---|---|
Configure "edit equipment info" page As the system administrator, I need to determine which pieces of device-specific information will be required for each CCE added at the facility level so that a detailed CCE record is created for each facility. Acceptance criteria:
| |
Edit CCE in catalog As an EPI Program Supervisor, I want to edit the information for the CCE in the catalog so that I create an accurate catalog of all the possible CCE devices for use in the country. | |
Delete CCE from catalog As a, EPI Program Supervisor, I want to delete CCE from the catalog so that I can maintain an accurate list of the CCE available for inclusion in facility lists (avoiding incorrect adding of CCE that is the wrong type.) | |
Add non-catalog CCE to facility inventory As a CCE technician, I want to be able to add a CCE device that is not in the CCE catalog to my inventory so that I can accurately track all CCE at my facility, even if it is not recognized by the central level. | |
Suggest CCE for catalog As a CCE technician, I want to be able to suggest a CCE device for inclusion in the CCE catalog so that I can:
| |
Search/View CCE Inventory (equipment) to be added | |
Transfer CCE inventory (equipment) to be added |
Reports | |
---|---|
Replacement plan report As a National logistician i should be able to get report for CCE replacement plan and CCE functionality status By Regions, Districts and Health facilities Acceptance Criteria 1. Replacement plan report with numbers of refrigerators under that particular year of replacement so that when i click that number it directs towards that list of CCE. 2. Replacement plan for Region, District and Health facilities (regions),National Level (districts) and National Level (health facilities) respectively. 3. Pie charts which shows proportional by functionality status. | |
Repair parts needed report As a CCE technician I would like to run a report of all the spare parts needed for repair of CCE in my supervised facilities so that I can source the needed parts and prepare for a repair trip. | |
Specify Spare part that is needed As a CCE technician I would like to specify the name of spare part that is needed in the CCE so that I can run a report of spare parts needed for all my supervised facilities. Acceptance Criteria: 1. On the Not-functional status. If the reason is Need spare then the user should specify by typing the name of the spare part needed | |
Min/Max temperature report As a DIVO, I would like to generate a report of facilities needing cold chain maintenance based on temperature alarms from monthly reports… so that I can reduce the risk of damaging vaccines due to temperature excursions. |
RTM - NexLeaf Integration | |
---|---|
Configure RTM pages As a system administrator, I want to configure the RTM pages so that I can specify input types available and specify options for types/frequency/escalation of alarms. | |
Configure alert settings As a Program supervisor, I want to configure alert settings so that I can specify who gets the temperature alerts, in which facility and within what parameters. | |
Add RTM to facility As a CCE technician, I want to add RTM devices to my facility so that I can receive alerts from specific devices working within my purview. | |
Parse RTM temperature output As a CCE technician, I want my OpenLMIS to parse alerts from my RTM so that I can receive notifications within OpenLMIS on fridges that are not functioning normally. | |
Generate temperature alert As a CCE technician, I want OpenLMIS to generate alerts based on temperature outside the normal range so that I can better monitor the health and status of my cold chain system. | |
Escalate temperature alert As a Program supervisor, I want the temperature alerts to escalate up the management hierarchy if they have not been addressed in time so that aissues with the cold chain do not go unchecked. |
Open Questions:
- What is the value around having/needing certain notifications within the workflows? (within OpenLMIS workflow) Is there a need for that real time info here, or can we view it outside the system. What are the different values of both?
III - What is the "ask" from small group?
At the end of Round 1, we want the group to report back to the plenary with X.
To get this, the small group will work on the following:
Reference how this is set up here: http://boardthing.com/board/58f66e449ff9028fc8fad53d
Walk everyone through what is proposed – pause to make sure they get it and then do voting.
At the end of Round 2, we want the Facilitator to report back to the plenary with Y.
To get this, the small groups (on rotation, global cafe style), will on work on the following:
IV - Notes to Facilitator
- We will have the generalizable country profiles – review with the group often to see if for both countries needs, the MVP is applicable.
- Always ask about which unit of data capture and data view – doses or vials
- Remind resource constraints and time constraints (software needs to be released by November!) when needed
- Remind folks that simplicity is a beautiful thing! Getting folks to think of end user and the need to not overwhelm them with several features but the minimum necessary to do their job well is key.
V - Archive
The following requirements pages informed the work under this domain:
This is the boardthing link to an internal discussion on this domain: