2019-08-26 Meeting Notes

Participants

Agenda

  1. Current Status
  2. Present at upcoming Product Committee

Notes

Status:

  • Chongsun
    • Stood up instance of v3 reporting stack
      • Very little data for reporting stack to be useful
    • Progress is stuck on getting the test systems set up
  • Philip working on monitoring, proof of concept looks good
  • Josh
    • From meeting with Ashraf/Elias - Question about how much data needs to be moved over
  • Ian/Hassan
    • Working on NIDC integration
    • Setting up pipeline and v3

Test Instance Setup

  • Josh: These systems are intended to be setup on multiple machines. Standing up on a single server will require a power machine
  • Alfred: TZ team has been trying to set up everything on the same server (as this was all that was available)
  • Current setup:
    • 16GB RAM, Lots 'o space, CPU?
    • Chongsun: Potentially possible to house elmis, pipeline, and v3 (not the reporting stack)
  • Next Steps
    • Setup v3 on a separate AWS instance (which account?)

NIDC

  • Josh: There is value in having v3 in the NIDC but it may not be worth having the whole pipeline in the national data center as this may slow things down
    • Install the pipeline and v3 in AWS. Move to NIDC as possible
    • Ian and Chongsun agree with this approach

Next Steps

  • Continuing to work through Casper epic tickets
  • Josh - proof of concept is wrapping up (nice!), now we're reading for the next phase
    • Need to figure out what that next phase would be and where the funding would come from
    • Need to show the poc working with the reporting stack
  • Alfred - Feedback from Ashraf/Elias to improve certain aspects of the workflow could be taken into account

Action Items